How much time are your NDT inspection reports costing you each month?

Use this 60-second calculator to estimate hours lost to manual reporting, rework, and approvals — then see how to reduce it.

Calculate Your Reporting Costs

Adjust the inputs below to match your current workflow

Inspection Volume

200
5

Higher inspection volumes compound inefficiencies. Even small per-report delays add up quickly at scale.

Report Creation Time

45

Manual data entry, formatting, and finding inspection photos are typical time drains in traditional reporting workflows.

Rework & Corrections

15
30

Rework often comes from disconnected data capture and inconsistent templates. Standardization dramatically reduces revision cycles.

Approval Delays & Labor Costs

2

Used for timeline impact (not directly in cost calc)

Include wages, benefits, overhead

Approval delays don't just cost time—they delay billing and reduce client satisfaction. Faster turnaround improves cash flow.

Your Reporting Cost Analysis

Here's what inefficient reporting is costing your business

Total Hours per Month

0

Base reporting + rework time

Estimated Monthly Cost

$0

Labor cost for reporting

Annual Cost

$0

Projected yearly expense

Potential Monthly Savings with Streamlined Reporting

$0
Conservative (20%) Typical (30%) Optimized (40%)

Savings range based on industry benchmarks for workflow automation

Your Biggest Cost Drivers

Get Your Personalized Savings Summary

Enter your details below to receive a detailed PDF report with recommendations specific to your workflow.

Thank you! Your summary is on its way.

Check your email for your personalized savings report. Our team will follow up within 1 business day to discuss your results.

Ready to Transform Your Reporting Workflow?

See how Floodlight's mobile-first platform eliminates manual data entry and reduces report turnaround time by up to 70%.

Scroll to top